Feasibility Study, Detailed Engineering Design, Mobilization of development and Preparation of Tender Documents for Water Supply Improvement Works to Sikonge Towns. World Bank funded
Feasibility Study, Detailed Engineering Design, Mobilization of development and Preparation of Tender Documents for Water Supply Improvement Works to Sikonge Towns. World Bank funded
CLIENT
Ministry of Water
DATES
June 2015 – February 2016: Feasibility Study and Detailed Engineering Design
SCOPE OF WORKS
To develop a cost-effective design for the water supply to Sikonge town as well as villages located within 12 kilometers from the pipeline route through identification of optimum sources, designing new and rehabilitation of the water supply networks using Lake Victoria as a source
LOCATION
Tabora – Tanzania