Feasibility Study, Detailed Engineering Design and Preparation of Tender Documents for Water Supply Improvement Works to Tabora, Igunga and Nzega Towns, World Bank funded
Feasibility Study, Detailed Engineering Design and Preparation of Tender Documents for Water Supply Improvement Works to Tabora, Igunga and Nzega Towns, World Bank funded
CLIENT
Ministry of Water
DATES
July 2014 –June 2016: Feasibility Study and Detailed Engineering Design
SCOPE OF WORKS
To develop a cost-effective design for the water supply to Tabora, Igunga and Nzega towns as well as villages located within 12 kilometers from the pipeline route through identification of optimum sources, designing new and rehabilitation of the water supply networks using Lake Victoria as a source, Institutional Capacity Assessment, Carrying ESIA related and Conducting RAP related works.
LOCATION
Tabora – Tanzania
PARTNERS
Metaferia Consulting Engineers & Don Consult Ltd